Road delays for ferry traffic 23/3/14
Travellers are advised to allow extra time to catch the Stornoway ferry due to resurfacing works delays on the A835 Inverness to Ullapool road.
Traffic will be stopped at the roadworks between 7am and 7pm to be led through at 10mph in a single lane convoy system.
The works are scheduled to be completed by Friday night.