A smaller, slower ferry will cover the Sound of Harris route while the MV Loch Portain is undergoing her annual refit.
The Loch Bhrusda will operate an amended timetable and sailings take ten minutes longer.
Morning sailings up to Saturday are altered.
Reservations for all sailings as the relief vessel is of smaller capacity.
Relief ferry on inter-
11 January 2018