Site temporary portable office building for additional space relating to electrical
contracting business -
A Campbell Electrical Services Ltd, Unit 2, Mossend Industrial Estate, Rathad A' Mhaoir, Stornoway
Construction of access road -
Erect house -
Construct extension to existing premises -
Install telecommunications apparatus -
Applications for planning permission
29 April 2015
Alteration and conversion to office spaces -
Replace the existing marine fish farm comprising, 12 x 28.6m diameter cages, with
8 x 38.2m diameter cages, configured in two groups (of 2x2) within an 88m grid layout.
A new feed barge will be moored alongside the cages, located to the west of the centre
of the cage grid -
Localised repairs and restoration of the crenellated sea wall, involving the rebuild
of failing sections of wall to match the original height and profile; restoration
to utilise salvaged rubble and to incorporate drainage outlets -
Bastion wall repairs; Castle steps restoration; and sunken garden walls/steps restoration
-
Removal of mansard roof and replaced by smaller rooflight structure; replacement
of existing stair and windows with steel stair and sash and case windows -
Restoration of the Porter's Lodge House and arched gateway to Lews Castle Grounds
-
Change of use from shop to tattoo studio -
Radwin antennas and one wireless access point to be fitted onto two poles attached
to the ferry terminal building at a height of approx 7m AGL. One external access
point to be mounted onto CalMac's DOT Matrix sign at slipway entrance at a height
of approx 5m AGL. -
Application under Section 42 to vary Condition 3 of consent 07/00256 (amend condition
to retain caravans on site over summer season) -
Erect domestic garage -
External painting to rear elevation of building -
Winning/working minerals -
Erect 8 wind turbine generators (approx 126.5m to tip) with associated infrastructure
to include site access, tracks, crane hardstandings, temporary construction compound,a
sub station/control building and underground cabling -
New recycling warehouse building, Iso tank bund with shelter, yard hard standing
to accommodate vehicle movements, additional parking provision, all associated drainage
including interceptor tanks and recycling skip area -
Erect house, install air source heat pump & roof solar panels -