Applications for planning permission 13/10/14
Erect House and install air source heat pump -
Modification of existing marine fish farm from 16 x 29m diameter cages (arranged
in 2 groups 2 x 4) within a 60m grid to 16 x 120m diameter cages (arranged in 2 groups
of 2 x 4) in a 90m grid. A feedbarge will be moored between the centre of the cage
group -
New single-
Alter internal layout, replace external door and create new external door opening
-
Construct kitchen extension. Erect portal frame greenhouse & external boundary wall
-
Erect shed -
Erect signboard – Signboard, Borve, Berneray, Isle Of North Uist
New front entrance canopy. New external cladding and roughcast panels. Removal of
skylights and replacement of roofing material on flat roof -
Install domestic air source heat pump – Clachan, 3 Lochcarnan, Isle Of South Uist