There was no vessel available to operate the South Uist -
Both sailings were cancelled as a result.
A "technical issue" has delayed the designated vessel, MV Lord of the Isles, from departing her annual overhaul in drydock.
The winter South Uist -
It is understood she understood trials yesterday and returned to her berth for more repairs.
The MV Isle of Arran is covering her runs but she was despatched to undertake a run from Oban to Castlebay and Lochboisdale following yesterday's storm cancellations.
Lack of ship forces timetable cancellation
17 November 2015